Posts by Milla

    Hi all,

    Could someone know how to manage the cutting process in the next situation:

    I create the part in woodwop with 3 operation: drilling (grill_tool), pocket (tool1) and vertical trimming (tool2). With the cute right I nest 10 of this with optimiz.vert.drilling.

    What I expect: cnc do all drilling first -> all pocket with tool1 ->change tool1 to tool2 -> all VT.

    What happens: cnc do all drilling first -> pocket on first part with tool1 ->change tool1 to tool2 -> VT on first part ->change tool2 to tool1 -> pocket on second part with tool1 ->change tool1 to tool2 -> VT on second part -> ...

    Is it possible to set somehow "all drilling" -> "all tool1 operations" -> "all tool2 operations"


    Thanks.